Welcome! My name is ArmNo. I'm computer engineering student of Chiang Mai University, Thailand. This blog is about my internship program summer 2009. Enjoy!

Daily Note 05.13.2009

05.13.2009
    0910 – arrive @ office
    1000 – start notepad++
    1153 – wait for P Jay restoring DB (SN Screen Capture assignment)
         – talk with Thanh for testing
    1200 – talk with P Wan about remained tasks.
    @TODO my left things
        [4]change I_TREE structure (use task_id instead of task_name, seperate with dot(.)
        [5]multiple users
        [6]merge input page with my calendars
    @TO HELP Thanh checking …
        1. log in & log out
            – username can’t leave blank.
            – can check correct password
            – ‘remember me’ .. i don’t know.
            – after login => redirect to add to report page
            – direct to application w/o loggin in
            – log out menu in every pages.
        2. add to report
            – select resource name => data below changed
            – change date => data change
            – total hour calculation
            – ot. request field
            – add button (toggled) & close button
            – timefrom and timeto
                – select timeto to tomorrow will add 2 record (today and tomorrow)
            – project, tasktype, task => correct order
            – add & cancel button works?
                – cancel will clear all forms
            – edit => load data into input form => button changed to save
                – when cancel => button change to add
            – delete button with alert message
            – conflict time of the same task are not allowed.
                – but for different task, it can.
        3. time sheet
            – display correct data in header table
                – date => today’s date
                – project name => all task done in that month
                – data in table
                    – time
                    – work hour
                    – total hour
                    – week total calculation is not done.
                    – month total is calculated.
            – check for printing. using print preview or print.
    1345 – back from lunch.
         – talking with P Wan => menu for application
    @TODO
        !- list remain tasks => P Pong
        – check schedule of everyone => P Pong
        !- design app’s menu => Itzco
        – use Tortoise HG => .. me ?
        – send email to Tien => P Pong (after list remained tasks)
        !- (P Tae’s) capture screens from SN application and paste on PPT file before friday
    1459 – the rests
        *[4] change I_TREE structure. Use task_id instead of task_name, seperate with dot(.)
        [5]  create tree input
        [6]  merge input page with my calendars
    1526 – design app menu
         – integrated login.
    1623 – inspect SN bug => capture all screen
    1648 – SN screen capturing
        errors – header already sent
               – ‘Plan – A’ => class not found
               – ‘invoice_inquiry’=> ‘kumkum’
               – ’sale_inquiry’ => ‘kaha’
               – ‘new_distribute_sale_entry’ => class not found
               – ‘dist_s_inq_tran’ => 2 forms too long (FF3)
               – ‘monthly_com’ database exceptions (2)
               – ‘export_item’ database exceptions (2)
    1946 – email sent. back home.

Leave a Reply